The Mid-Murray Area-scale Project annual reports help us understand how water for the environment maintains, protects and restores the rivers, wetlands, plants and animals in that Area. The annual reports also contribute to our legislative reporting obligations.
2024-25 report
Download
If you need help accessing these files, visit web accessibility.
This report is technical in nature and in some cases no alternative description has been provided. Please refer to the Summary Report for high level summary information or email the CEWH Environmental Water Science and Monitoring Section at CEWHscience@dcceew.gov.au if an alternative description is required.
Past annual reports
Access annual reports from past CEWH science programs, including Flow-MER (2019–2024) and the Long-Term Intervention Monitoring (LTIM) project (2014–2019). These reports provide insights into environmental water use and river health across Australia.
- 2023-24 Edward-Kolety-Wakool River System Annual Reports
- 2022-23 Edward-Kolety-Wakool River System Technical Reports
- 2021-22 Edward-Kolety-Wakool River System Annual Reports
- 2020-21 Edward-Kolety-Wakool River System Annual Reports
- 2019-20 Edward-Kolety-Wakool River System Annual Reports
